STREET MAINTENANCE DEPOT, LINZ

STREET MAINTENANCE DEPOT

The construction of the street maintenance depot exists of one entire building, which unifies all important uses under one roof.
The roof of the garage hall for the trucks, consists of pre-stressed reinforced concrete with trapeze tin roof, insulation and foil roof with
light dome bounds for exposuring the garage. Die exterior wall consists in the base section of concrete prefabricated components, over
that is a wall panelling of foamed lead paneels (B1). The two garage walls in the south and in the north consists completely of concrete
or concrete prefabricated panelling.
The whole building can be bypassed by the trucks.

Facts

Client

Landeshauptstadt Linz


Location

Linz, Österreich


Building task

Administration and garage building


Construction costs

€ 2,65 Mio.


Areas

ca. 2.850 m² BGF
ca. 2.590 m² NF


Construction period

2002 – 2005


Scope of services

architecture


Contact

schimek ZT gmbh
architecture+engineering

4020 linz, austria, europe
herrenstraße 2

P: + 43.732.736001
F: + 43.732.736001.15

office@arch-schimek.at

ZT-logo

Imprint · Privacy