As the final part of a huge Flood Protection Project with linear protection, this lot includes protective measures individually designed for 33 different objects.

Some buildings received new additions and attic extensions above the flood level (HQ-100) in order to substitute the building parts below. Subsequently the rooms under the flood line of HQ-100 can be left open and flooded.

Further measures as drainage, barricade against rising dampness and partly mobile flood protection elements.

Facts

Client

Machland-Damm GmbH


Location

4381 St. Nikola


Building task

Object protection (additions, rebuilding, new buildings) with mobile flood protection walls


Construction costs

€ 10,3 Mio.


Areas

ca. 3.180 m² BGF
ca. 2.540 m² NF


Construction period

2011 - 2013


Scope of services

Execution planning + síte supervision


Contact

schimek ZT gmbh
architecture+engineering

4020 linz, austria, europe
herrenstraße 2

P: + 43.732.736001
F: + 43.732.736001.15

office@arch-schimek.at

ZT-logo

Imprint · Privacy